880058 – Fit-out

Corsair 880058 has now reached the Fit-out stage, where we step-by-step install the interior, run wires for electric devices, and install the plumbing for the water system. The boat will soon be ready for her final look and will be taken into the QC/QA process.

880058 – Joining

Corsair 880058 has started construction in June. At the moment, the boat joins its hull and deck for the first time, along with the beamsĀ andĀ floats which are going to join soon at Trimaran factory.